Walk-in showers and tub-to-shower conversions in Montgomery County, PA
Before we price your shower remodel or tub-to-shower conversion, Dan checks what the old tub has been sitting on. A soft subfloor or a tired drain is how a new shower ends up leaking into the ceiling below.
4.9 from 155 reviews · Licensed & insured
Book a free estimate
Written estimate · No sales pressure · We answer the same day
Monday to Saturday, 7am to 9pm. A real person answers, not an AI assistant.
Pay over time: financing available through Acorn Finance. Check your rate
- Licensed & insured
- Two-year labor warranty
- Financing available through Acorn Finance
- 4.9 from 155 reviews on Google and HomeAdvisor
- Written price before work starts
- Every job within an hour of Meadowbrook
- The owner is on site every day
- Labor and materials in one price
- PA HIC #PA169291
Shower ideas for houses like yours
Imagined for the stone colonials, Tudors, Cape Cods, split-levels and ranches around Montgomery County.

Green vanity by a leaded window
1930s stone Tudor

Marble shower and an inset-drawer vanity
1920s stone colonial

Floating walnut vanity, glazed tile shower
1950s ranch

Oak vanity and a zellige shower
1960s split-level

Long oak vanity beside a glass shower
1960s split-level

Walk-in shower under a dormer
1940s Cape Cod

Curbless shower with a fold-down bench
1960s split-level

Curbless marble shower with a bench
1920s stone colonial

Curbless zellige shower with brass grab bars
1930s stone Tudor

Curbless shower on a checkerboard floor
1940s Cape Cod

Curbless shower and a floating walnut vanity
1950s ranch

Nickel sconces, greige double vanity
1920s stone colonial

Walk-in shower with a niche
1960s split-level

Marble shower with a bench
1920s stone colonial

Walk-in shower with a bench and niche
1960s split-level

Marble shower and a double vanity
1920s stone colonial
Bathroom remodels, before and after
Same rooms, before we started and after we finished. Every photo is from one of our jobs.

BeforeAfterTwo bathrooms with marble-look tile · Jenkintown, PA · 2025 · Aug 4, 2025 and Oct 17, 2025Drag to compare
Every photo on this page is from a job we finished in Montgomery or Bucks County.
Walk-in showers and tub-to-shower conversions we built, and what those homeowners said.
Small hall baths and full remodels, in Glenside, Wyndmoor and Spring House.

Glenside, 2020
“DCM remodeling just finished a two bathroom upgrade, we could not be happier.”
Keith and Trina · dcmphila.com reviews

Wyndmoor, 2024
“Dan the owner came out and explained everything. Super great guy and so easy to work with. Gave us a great estimate and was able to design the bathroom using space we didn’t even know we had.”
Vince M. · Google review

Spring House, 2023
“The bathroom is beautiful and no more standing water in the shower!”
Trish · dcmphila.com reviews
More photos from finished jobs
179 photos · swipe, tap to enlarge
Three ways to remodel the shower or replace the tub.
Which one fits depends on the room, the drain and how long you plan to stay in the house. The first one is the bathroom job we do most often.
| Option | Tub-to-shower conversion | Walk-in shower with glass | Curbless shower |
|---|---|---|---|
| What changes | The tub comes out and a tiled shower goes in the same spot. | A tiled shower with a low curb, and a glass panel or door instead of a curtain. | No step at all. The floor is lowered so water runs to the drain without a curb. |
| Best for | The tub nobody has used in years. | A shower replacement, a primary bathroom, or a room that should feel bigger. | Staying in the house for the long run. |
| Time on site | Usually about two weeks | Usually about two weeks | Longer, because the floor under it is rebuilt |
What decides the price of a walk-in shower.
Dan prices every job at your house, after he sees it. You get one written number two or three days later, with the labor and the materials in it.
Moving the plumbing
Moving the toilet, the shower drain, or adding a second sink: $1,500 to $4,000.
The materials
What you choose, from the tile to the fixtures.
What is under the tub
Older houses hide surprises there. Dan checks before he prices the job, not after demo.
A new shower is only as good as what's under the old tub.
A tub can sit for decades on a floor nobody has looked at. Build a new shower on a soft subfloor or a tired drain, and the first sign is a stain on the ceiling below. So Dan looks before he prices the job, not after demo day.
What he finds goes into the written price. Anything that only shows up once the tub is out, you see and approve in writing before we fix it.
What Dan checks at the visit
The subfloor around the drain
The drain line under the tub. Many older houses here still have cast iron.
The joists, and whether one was notched for old plumbing
The shutoff and the venting
How the job actually runs.
Four steps, in this order, every time. Each one answers something a homeowner told us they were worried about.
The questions homeowners actually ask us.
How long does a tub-to-shower conversion take?
Usually about two weeks on site. You get the schedule in writing with the estimate, not a verbal guess on the driveway.
What if there is rot under the old tub?
Is a curbless shower a good idea?
What is included in the price?
How much do you want up front?
How much does it cost to replace a tub with a walk-in shower?
Can a walk-in shower have no door?
Get a written price for your shower remodel.
The visit takes about an hour. You get the price in writing after it, not during. No same-day discount, no pressure to sign on the spot.
Pay over time: financing available through Acorn Finance. Check your rate