Serving Montgomery & Bucks County · Licensed & insuredServing Montgomery & Bucks County

(215) 552-7333

4.9 · 155 reviews

Serving Montgomery & Bucks County · Licensed & insuredServing Montgomery & Bucks County

Search services, costs and guides

Interior

Exterior

Additions & New Construction

Projects

Find Inspiration

About

4.9 · 155 reviews on Google and HomeAdvisor

Licensed & insured

Serving Montgomery & Bucks County

How long does a remodel take? Your project, week by week

What happens in which week on a bathroom, a kitchen or a basement, where the time really goes, and what you decide before the first day.

4.9 from 155 reviews · Licensed & insured

Written by Dan Marculescu, owner of DCM Remodeling · Updated October 2026

See how a job runs, step by step →

The short answer

A bathroom takes about one to three weeks of work, depending on its size, and most kitchens about four weeks, up to eight for a large one. Basements and additions take longer. Your dates are in the contract, and materials on order can move them.

  • Licensed & insured
  • Two-year labor warranty
  • Financing available through Acorn Finance
  • 4.9 from 155 reviews on Google and HomeAdvisor
  • Written price before work starts
  • Every job within an hour of Meadowbrook
  • The owner is on site every day
  • Labor and materials in one price
  • PA HIC #PA169291

Before the first day

The visit, the written price, the contract. This is also when the cabinets, the tile and the fixtures get ordered, because their lead time, not our schedule, usually sets the start date. Everything you choose before day one is a week you do not lose later.

Week 1: demolition and what is behind it

The room comes apart, the debris goes out every day, and we see what the house has been hiding: a soft subfloor, a cast iron drain, a notched joist, old wiring. Anything that was not visible at the visit you see now and approve in writing before it is fixed. This is the week most surprises happen, and the only week they can.

Week 2: rough plumbing, rough electrical, framing

New lines go where the new fixtures will be, new circuits go in, walls get framed or opened.

Week 3: walls close, tile and cabinets go in

Drywall or cement board, waterproofing in the shower, then tile. In a kitchen, this is when the cabinets go in and the counters get measured; counters are templated after the cabinets are set, and fabricated after that, which is a week of its own.

Week 4 and after: finishes and the walkthrough

Fixtures, doors, trim, paint, the glass shower door, the counters. Then the walkthrough with you, room by room, with a list of everything that still needs a touch. The final payment comes after the list, not before.

Where the time really goes

Lead times. Semi-custom cabinets can take six to ten weeks to arrive; custom ones longer. Special-order tile and fixtures the same. A counter is templated after the cabinets go in and comes back a week later. The cabinets and tile on order before the job. A surprise behind a wall, which means a change order you approve first. And changes mid-job, each of which is a change order and often a new order with its own lead time.

What you decide first

The layout: whether the plumbing stays where it is. The cabinets, the tile, the fixtures and the counters, chosen and ordered before day one. Where the crew parks and comes in, and which bathroom stays usable. The fewer decisions left for the middle of the job, the closer the last day lands to the date in the contract.

Questions people ask before they call

How long does a kitchen remodel take?

About four weeks for most kitchens, and four to eight for a large one. Our part is often done sooner; the cabinets and the countertops on order usually set the date. The dates are in your contract.

How long does it take to remodel a bathroom?

How long does it take to finish a basement?

How long does a home addition take?

Can we live in the house during the work?

What causes delays?

What happens if the job runs over the date?

Get a written estimate, with the dates in it.

The visit takes about an hour. You get the price in writing after it, not during. No same-day discount, no pressure to sign on the spot.

Pay over time: financing available through Acorn Finance. Check your rate

Find Inspiration