A four-season room added along the side of a house in Glenside, on a new foundation with a crawlspace. The job is still going. These are the site photos so far, from the footings to the roof framing.

The job, step by step
Photos from the site, by date. New ones go up as the work moves.

Sep 18
The ground dug out next to the house and the footings poured.

Sep 23
Forms set for the foundation walls, gravel spread inside.

Sep 28
Foundation walls in. The crawlspace floor is poured.

Sep 29
Forms off: poured concrete walls with vents for the crawlspace.

Oct 6
Soil backfilled and graded around the foundation.

Oct 8
Sill plates and rim joists on top of the foundation.

Oct 8
Floor joists in, tied to the house on one side.

Oct 9
Insulation between the floor joists, over the crawlspace.

Oct 9
Subfloor down.

Oct 9
Walls framed flat on the new floor, ready to stand up.

Oct 12
Walls up and the roof rafters set.

Oct 13
Roof sheathed. The window openings are framed.
Every photo from this job
Tap any photo to see it full size.
11 photos · swipe, tap to enlarge
Addition ideas for a job like this
Ideas for a job like this one. Heart the ones you like and send them to Dan.

Four-season room with a beadboard ceiling
1940s Cape Cod

Stone two-car garage with a breezeway
1920s stone colonial

Stone colonial with a side sunroom
1920s stone colonial

Split-level with a full second story
1960s split-level

Gable portico with round columns
1920s stone colonial

Detached Tudor garage with wood doors
1930s stone Tudor

Screened porch with a pale blue ceiling
1930s stone Tudor

Sunroom with a walnut wet bar
1950s ranch

Sunroom addition in wood and stone
1920s stone colonial

Gable sunroom with black frames
1960s split-level