Elkins Park, 2025
Main floor with a new kitchen
First floor opened to the studs, then finished with light hardwood floors, dark green walls in the living room and bedrooms, and a white and green shaker kitchen with a farmhouse sink. The finished rooms appear only in before-and-after collages.

The job, step by step
From the first visit to the finished room, with the dates the photos were taken.
Dec 23, 2025
Exterior walls opened to the studs
Dec 23, 2025
Rooms cleared for new floors
Mar 7, 2026
New white and green kitchen
Every photo from this job
Tap any photo to see it full size.
4 photos · swipe, tap to enlarge
Whole-house ideas for a job like this
Ideas for a job like this one. Heart the ones you like and send them to Dan.

Marble island in a stone colonial kitchen
1920s stone colonial

Living room by the split-level stairs
1960s split-level

Blue-gray kitchen with a farmhouse sink
1940s Cape Cod

First-floor primary bedroom addition
1960s split-level

Four-season room with a beadboard ceiling
1940s Cape Cod

Open kitchen with a stone-topped island
1960s split-level

Green kitchen with a plaster hood
1930s stone Tudor

Mudroom and laundry off the garage
1960s split-level

Eaves bedroom with built-in drawers
1940s Cape Cod

Bedroom with a new tray ceiling
1960s split-level