Permit management in Montgomery County, PA
Every township here issues its own permits, with its own forms, fees and inspectors. On our jobs, the permit is our job: we check what your township wants, file it with the drawings it asks for, schedule the inspections and meet the inspector. The fee is a line in the written price, never a surprise.
4.9 from 155 reviews · Licensed & insured
Pay over time: financing available through Acorn Finance. Check your rate

Jamison · Foundation inspected before the framing, 2024
- Licensed & insured
- Two-year labor warranty
- Financing available through Acorn Finance
- 4.9 from 155 reviews on Google and HomeAdvisor
- Written price before work starts
- Every job within an hour of Meadowbrook
- The owner is on site every day
- Labor and materials in one price
- PA HIC #PA169291
Before and after: garages, additions and new rooms
Same rooms, before we started and after we finished. Every photo is from one of our jobs.

BeforeAfterGarage turned into a room · Bensalem, PA · 2021 · Dec 22, 2021 and Dec 31, 2021Drag to compare
Every photo on this page is from a job we finished in Montgomery or Bucks County.
Permitted jobs we ran, and what those homeowners said.
Additions, basements and structural work, each with the permit filed by us and the inspections passed, in Jamison, Glenside and Abington.

Jamison, 2024
“Dan was a true gentleman and avid businessman and we always had the impression he was always looking for our best interest. Honest to a fault.”
Jordi F. · Google review

Glenside, 2024
“He picked up the phone the very first time I called and worked around our busy schedule and came out several days later in a snow storm on a weekend to look at the project.”
Elena K. · Google review

Abington, 2024
“Dan is the kind of contractor who would flag something before it became a problem rather than after, which made the whole process a lot easier to navigate.”
Shawn E. · Google review
More photos from finished jobs
75 photos · swipe, tap to enlarge
What decides the price of permit management.
Dan prices every job at your house, after he sees it. You get one written number two or three days later, with the labor and the materials in it.
The township
Each one has its own fees, forms and review time.
Drawings
Whether drawings or an engineer's letter are required. Additions and structural work usually need both.
Inspections
How many the job has. Rough plumbing, rough electrical, framing, insulation and final each take a visit.
What permit management covers
Finding out what your township wants
Before anything is drawn, we check with the office that issues the permit: the forms, the drawings, the fee and the review time.
Filing the application
We prepare the application, the site plan and the drawings, and we file as the contractor, so the inspector is checking our work.
Zoning first, when it applies
Additions, sunrooms, decks and in-law suites need a zoning review before the building permit. We handle it.
Scheduling the inspections
Rough plumbing and electrical before the walls close, framing, insulation and the final. We book them and we meet the inspector.
Fixing what fails
If an inspection fails, we fix it and schedule the re-inspection. You do not have to call anyone.
The final sign-off
The closed permit is your record that the work was inspected. It matters at resale and for insurance.
Why the contractor should pull the permit, not you
A homeowner can pull a permit in Pennsylvania. When the contractor does the work, the contractor should be on the paperwork, because the inspector is checking that contractor's work and the township holds the permit holder responsible for it. A contractor who asks you to pull the permit yourself is usually keeping their name off a job they do not want inspected.
Ask us for the permit number on your job and check it with the township yourself. We would rather you did.
What we file for a typical remodel
The building permit application, as the contractor
Electrical and plumbing permits where the township issues them separately
Drawings and the engineer's letter, when the work is structural
The zoning review for anything that changes the footprint
The inspection schedule, with every visit booked by us
How the job actually runs.
Four steps, in this order, every time. Each one answers something a homeowner told us they were worried about.
Questions homeowners ask about permits.
Do I need a permit to remodel?
Usually, yes, once plumbing moves, a circuit is added, a wall opens or a window gets bigger. Paint, floors and cabinets in the same spots usually do not. We check with your township and pull what is needed.
How much does a permit cost?
How long does a permit take?
What happens if I remodel without a permit?
Who is responsible for pulling the permit?
Which township issues my permit?
Can I check that the permit was really pulled?
Get a written price, with the permit in it.
The visit takes about an hour. You get the price in writing after it, not during. No same-day discount, no pressure to sign on the spot.
Pay over time: financing available through Acorn Finance. Check your rate